Portside Pipe Spool Retrofit

Fitter preparing a replacement pipe spool at the port facility

Pipe welding — Port of Brisbane

Overview

Portside Logistics had a 72-hour maintenance window to replace six corroded carbon-steel spools on a washdown line. We pre-fabricated every spool in Wacol from laser-verified site measurements, then cut out, fitted, TIG-welded and hydro-tested the lot across two night shifts.

The risk was restart day: any leak would idle the berth. Every root was argon-purged, every weld mapped, and the line held test pressure first attempt — handed back eight hours inside the window.

Scope of work

  • Laser measure and off-site spool fabrication
  • Purged TIG roots with MIG fill and cap
  • Hydro-test, weld maps and QA dossier
  • New supports, gaskets and corrosion coating
Laying a TIG bead on a replacement spool Night-shift welding on plant pipework